Wednesday, 15 June 2011

Pre Exhibition week day 2

Today I have made a massive leap in terms of progression. I have painted the walls of my space and made sure they are suitable. I have also provided a back up plan for the monitor bracket, I will use a Wooden plinth to rest the monitor on. I am hoping that I will not have to use it though. 

Also I have got the materials for my cabinet and have put together about 60% of it.  The measurements have been shortened to 13''x 68.5'' and the persepex has been cut to similar measurements. The cabinet is supported by 3 brackets which are positioned at each point.  I have put up the brackets and put together the base and sides which have also been routed to slide the perspex in. These are already fixed to the brackets and I have given them a base coat of white Vinyl matt. Tomorrow I will paint them again so that they are ready for final assembly.  Also my dad has supplied 45 meters of black lining for the cinema which is being turned in to curtains for the cinema walls.

Tomorrow I want to get the cabinet finished so Friday is free to get the monitor in place and solve any problems that may rise.  Also I have finalised the plans for a loop on the DVD with Brian which should be ready for Monday/ Tuesday.

No comments:

Post a Comment