My installation is nearly complete, The first thing I did today was get the monitor to college and go about getting it into place. With the help of my Tutor, we mounted it on the Plinth that I kept as a back up and drilled some screws into the wall to support it. The Plinth just needed touching up with some white paint afterwards.
I also started to look at Lighting the space that I am using. There is a water pipe suspended above the cabinet which I am using for the moment to hold the Clip on lighting that has been provided. There are two spotlights that cover most of the wall space opposite. There are still a few other ways that I would like to experiment with in order to find the easiest way to Light the space and walls and also hide the cables as there has been another extension cord added to power them. I did think about taping the cables onto the pipe but this could be risky as it could weigh the pipe down in time.
The quotation that I am using has been chosen from A book that Jamie suggested to have a look through for quotation. I will post this in its entirety next. This is going to be mounted on an MDF board which has been painted white. The quote will then be printed onto foam mounting board and either spray mounted or PVA glued.
I still have Monday and Tuesday to try out different styles and techniques. Also I have been told that the DVD will be ready for Monday and I wil be able to test the installation in full on Monday.
No comments:
Post a Comment