Monday, 20 June 2011

Pre Exhinition day 5

Today is the start of the final build up to the Exhibition. Everybody has worked so hard up to now and the exhibition is within sight.

Today I have started to look at the positions of the quote mounted on the wall, the synopsis and the spotights.  Also I have been lending a hand to people who needed some help. 
The spotlights have been mounted on to the water pipe above the cabinet and positioned accordingley. I have taped the cables to the back of the pipe to make it look a bit more tidy.
There are plenty of jobs that need doing that arent paramount of importance at the moment but they will come into play in the next two days, Little things like touching up walls, vacuming and cleanignt he carpets, floors in AD14. 
Furthermore today witht he help of Jamie (Tutor) I put up the curtain in the doorway.  This was easy enough to do.  There was a length of dowling painted white and a black curtain that had been adjusted.  All it needed was two holes to place the ends in which was done in about 15 mins.

No comments:

Post a Comment